/ Service

Container shipping

REF: SRV-CONTAINER-SHIPPING

Intermodal movements between road, rail and sea, with the port handover compressed from eighty-seven minutes to thirty-one.

A green Translog shipping container lifted by a quayside crane Container shipping
31 MIN
Median port dwell
28 T
Max payload
33 M³
Volume · 20 ft ISO
ISO 668
Standardisation

Every intermodal move has one weak joint: the moment a box stops being a maritime asset and becomes a road asset. Everything upstream is planned in days, everything downstream in minutes, and the two schedules meet at the quay.

The ninety-minute problem

A container discharged at Le Havre is theoretically available the moment the crane releases it. In practice it waits — for customs clearance, for a slot, for a driver whose tachograph still has hours on it. Across our own corridors the median dwell between crane release and gate-out was eighty-seven minutes. Not catastrophic. Just repeated four thousand times a year.

What we changed

We stopped treating the port call as an event and started treating it as a window: paperwork pre-cleared against the bill of lading, drivers rostered against the berth window rather than the published ETA, and a chassis already staged inside the terminal gate.

Median dwell is now thirty-one minutes. The corridor did not get shorter — the waiting did.

Where it does not work

None of this survives a congested terminal. Above roughly eighty-five percent of crane capacity the berth window itself becomes unreliable, and slot-matched rostering costs more in idle driver hours than it saves in dwell. On those lanes we run the conventional model, and we say so in the quote.

/ Next service Road freight
/ Next step

Put a number on your container shipping.

Send the lane, the volume and the receiving hours. You get a costed answer within two working hours.

Request a quote All services
+33 (0)2 99 00 00 00
contact@translog.eu